Offline
This may just be my luck in an A/B test but currently when I am trying to look at lake availability there is no longer a calendar link to click once you have selected a lake. Instead you need to use the master calendar and load all the lakes to view availability after finding the one you're interested in? I am running site scout so maybe there is a loading conflict but I am not seeing any errors on the page with the Inspect window open.
Is anyone else seeing this or do I maybe need to get some sleep?
ed: tested with site scout disabled and same result
Last edited by GordK (6/17/2025 7:35 pm)
Offline
Yes same result. No calendar available after selecting a lake. Just a master list as you discovered.